Blog / Western Costa del Sol plan approved: train beyond Fuengirola, toll-free AP-7 and a new junction at La Cala de Mijas
Noticias · Costa del Sol

Western Costa del Sol plan approved: train beyond Fuengirola, toll-free AP-7 and a new junction at La Cala de Mijas

26 de noviembre de 2026 · Plexo Properties
Western Costa del Sol plan approved: train beyond Fuengirola, toll-free AP-7 and a new junction at La Cala de Mijas
Quick answer

On 25 November 2026 the Junta de Andalucía approved a new Territorial Plan (POT) for the western Costa del Sol. It covers nine municipalities from Fuengirola to Manilva, and it backs extending the Cercanías train beyond Fuengirola, free AP-7 travel for residents and six new AP-7 junctions, one of them at La Cala de Mijas. The train and motorway measures still need the Spanish government on board, so none of them has a date yet.

We have been waiting for this one for twenty years. The previous plan for the western Costa del Sol was approved in 2006 and later annulled by Spain’s Supreme Court, so the nine municipalities between Fuengirola and Manilva have grown without a shared regional plan for most of that time. On Wednesday the Junta’s Council of Government approved the decree for a new one, together with a monitoring committee in which the Junta, the central government, the Málaga Provincial Council and the nine town halls all sit (Hoy Diario).

The plan covers Fuengirola, Mijas, Marbella, Estepona, Casares, Manilva, Ojén, Istán and Benahavís. According to Diario SUR, the population of these nine municipalities has roughly doubled in two decades to almost half a million residents. Anyone who drives the A-7 in August can feel that number.

Most of our clients buy in La Cala de Mijas, Mijas Costa and Marbella East, right in the middle of this stretch. So this is how we read the plan: what it says, what it changes and what is still a wish.

Key fact Detail
Approved 25 November 2026, Junta de Andalucía Council of Government
Municipalities Fuengirola, Mijas, Marbella, Estepona, Casares, Manilva, Ojén, Istán, Benahavís
Replaces The 2006 plan (Decreto 142/2006), annulled by the Supreme Court
Headline transport ideas Cercanías beyond Fuengirola, free AP-7 for residents, public-transport lane on the A-7, six new AP-7 junctions
Town halls’ deadline Four years to align their general urban plans
Progress report Every three years, published by the Junta

The train: Cercanías beyond Fuengirola

Today the C-1 Cercanías line runs from Málaga through the airport, Torremolinos and Benalmádena and stops in Fuengirola. West of there you drive or take the bus. The new plan supports extending the line along the entire western coast and links the area to the Mediterranean Corridor and Spain’s high-speed network (El Español).

Rocío Díaz, the regional minister for housing and territorial planning, said the aim is for the railway not to stop in Manilva, where the plan’s area ends, but to reach Algeciras (Al Sol de la Costa).

The honest answer to “when?” is that nobody knows yet. The Ministry of Transport awarded a feasibility study for a Costa del Sol rail corridor between Nerja and Algeciras in 2025 (BOE). After a four-month extension it is now due in April 2027. The Ministry’s own demand estimate is up to 60 million trips a year on the full corridor, 46 million of them between Málaga and Estepona (El Español). There is no route decision and no construction timetable yet.

White Renfe passenger train with red and purple stripes running on electrified tracks past apartment blocks
The C-1 Cercanías line currently ends in Fuengirola. The plan backs extending rail west along the coast towards Marbella, Estepona and Algeciras. Illustrative image.

The AP-7: no tolls for residents

The plan takes up a demand local town halls have made for years: removing the toll on the AP-7 motorway, at least for residents of the nine municipalities. The reasoning is that if residents can use the AP-7 for free, through traffic moves onto it and the A-7 gets some breathing room.

This is a state road, so the Junta can recommend it but can’t decide it. Until Madrid agrees, the toll stays as it is. We think it’s still worth knowing, because once the plan is published in the BOJA, free AP-7 travel for residents becomes official regional policy.

The A-7: from coast road to public-transport corridor

With more long-distance traffic on the AP-7, the plan wants the A-7 to become a more urban, metropolitan corridor with a lane or platform reserved for public transport (Hoy Diario). For anyone living between Fuengirola and Marbella this is the part that would change daily life most. You would get faster buses, fewer cars at the La Cala and Calahonda junctions, and possibly an A-7 that feels less like a motorway through the middle of town.

DGT traffic camera view of queuing cars on the A-7 at La Cala de Mijas on a summer afternoon, with the sea behind
The A-7 at La Cala de Mijas (km 1023) at 14:03 on 3 August 2026: traffic queuing in both directions. Image: DGT traffic camera.

Six new AP-7 junctions, one at La Cala de Mijas

This is the detail we noticed straight away. The plan proposes six new junctions on the AP-7 (El Español):

  • Casares
  • Benahavís
  • Istán
  • Near Hospital Costa del Sol in Marbella
  • La Cala de Mijas
  • Las Lagunas in Mijas

Today, getting from La Cala or the hillside urbanisations above it onto the AP-7 means a detour to an existing junction. A direct junction would cut travel times to Marbella, Málaga and the airport for La Cala, La Cala Golf and the inland side of Mijas Costa. The junction near the hospital would do the same for Elviria and the eastern side of Marbella. Like the other road measures, these need the central government’s agreement before anything is built.

Housing: residents and first homes come first

The plan is about more than roads and rails. It tells town halls to base future residential planning on what local people actually need, and to prioritise first homes and protected (VPO) housing for lower-income households.

Other points worth knowing:

  • 13 priority areas for action, mostly along the A-7, to bring services closer to residents.
  • La Torrecilla in Marbella and Las Lagunas in Mijas are earmarked for facilities serving more than one municipality.
  • New urban centres at San Luis de Sabinillas and Bahía de Casares, to give established residential areas their own services.
  • Land with natural or landscape value is protected from development, and mapped flood-risk zones are excluded from new building (Hoy Diario).

For buyers, protected land and fewer areas open to building mean that good locations that already have planning permission become scarcer over time. That is one reason we keep following the new developments that are already approved along this coast.

Water and green spaces

After the recent droughts, water security is a central part of the plan. It makes expanding the Marbella desalination plant a priority and proposes a two-way connection between the water systems of Málaga city and the western Costa del Sol, so each can support the other in dry years. It also includes renewing pipes to cut leaks and using more treated wastewater.

On the environmental side, a green network will link protected inland areas to the coast through river corridors. It includes five parks serving more than one municipality, two of them new: Guadaiza and Elviria, both in Marbella. The Senda Litoral coastal path and parts of the Gran Senda de Málaga walking route also become part of the network. If you like walking along the sea, our guide to every beach in Málaga province shows which stretches the Senda Litoral already connects.

The catch: Madrid has to agree

It’s important to be clear about this. The AP-7 and A-7 are state roads, and the railway is a central-government matter. The biggest transport measures in the plan therefore need the Spanish government’s agreement and direct involvement. They won’t happen just because the Junta has signed a decree.

The train is still at the study stage. The toll-free AP-7 is still a request. The new junctions still need agreement and design work. Treat these as a direction of travel, not as projects with a start date.

When does the plan take effect?

The decree comes into force the day after it is published in the Junta’s official gazette, the BOJA. From then on its rules apply directly and override local planning where the two conflict. The nine town halls then have four years to bring their general urban plans (PGOU) into line. The monitoring committee follows progress, and the Junta publishes a progress report every three years (Teleprensa).

What it means if you buy or own on the western Costa del Sol

This is a long-term framework, not a list of building projects starting next year. Still, it gives the area a clear direction, and four things stand out for us.

Better connections are on the agenda. A train beyond Fuengirola, a new AP-7 junction at La Cala de Mijas and public transport on the A-7 would make everyday life easier from Mijas to Manilva. Areas with a planned junction or a likely station nearby are worth watching.

Growth will be more controlled. Priority for first homes, protected housing and protected natural land points to more careful planning rather than open-ended expansion. For existing homes in established areas such as La Cala, Calahonda or Estepona, that tends to support value.

Water and services are being taken seriously. Desalination, links between water networks and new parks address some of the biggest concerns for people who live here all year.

Patience is needed. The headline projects depend on Madrid, and the train in particular is still on paper. Buy for the life the area offers today and treat the infrastructure as a possible bonus. Don’t pay a premium for promises.

If you’re new to buying in Spain, our buyer’s guide to the Costa del Sol walks through the process step by step, and the cost calculator shows taxes and fees on top of the purchase price.

We live and work in La Cala de Mijas and follow the plans for this coast closely. If you would like to know how the new territorial plan could affect a specific area or property, from Mijas to Estepona, get in touch. As a buyer you pay no agency fee to us.

Talk to Plexo Properties

Frequently asked questions

What is the POT for the western Costa del Sol?

The Plan de Ordenación del Territorio (POT) de la Costa del Sol Occidental is a regional planning framework approved by the Junta de Andalucía on 25 November 2026. It sets shared rules for growth, transport, housing, water and protected land in Fuengirola, Mijas, Marbella, Estepona, Casares, Manilva, Ojén, Istán and Benahavís.

Will the train be extended from Fuengirola to Marbella?

The plan supports extending the C-1 Cercanías line west along the coast, and the Junta wants it to reach Algeciras eventually. The railway is a central-government responsibility, and the Ministry of Transport’s feasibility study for the Nerja–Algeciras corridor is due in April 2027. There is no route or construction date yet.

Will the AP-7 become free for residents?

The plan includes removing the AP-7 toll for residents of the nine municipalities. The AP-7 is a state motorway, so it only happens if the Spanish government agrees. Until then the current tolls apply.

Is there a new AP-7 junction at La Cala de Mijas?

The plan proposes a new AP-7 junction at La Cala de Mijas, among six new junctions also including Casares, Benahavís, Istán, Hospital Costa del Sol and Las Lagunas. It is a proposal that still needs agreement with the central government before design and construction.

When does the plan come into force?

The day after the decree is published in the BOJA. From then on its rules apply directly, and the nine town halls have four years to adapt their general urban plans.

Does the plan affect property prices on the Costa del Sol?

Not directly or immediately. Over time, better transport links, protected natural land and stricter control of where new building is allowed tend to support demand for well-located existing homes. The major transport projects depend on Madrid, so we advise buyers not to pay extra today for infrastructure that has no date.

Sources: Hoy Diario · El Español · Teleprensa · El Periódico de Marbella · Diario SUR · Junta de Andalucía (POT summary document) · BOE. Last checked 26 November 2026.

Artículos relacionados

← Volver al blog